12.8 Electrical Power (ATA 24)
Level 3
Level 3
1.Batteries Installation and Operation;
2.DC power generation, AC power generation;
3.Emergency power generation;
4.Voltage regulation, Circuit protection.
5.Power distribution;
6 .Inverters, transformers, rectifiers;
7.External/Ground power. .Both the students and the training organisation are having too much freedom in interpreting the scope and the depth of the module.
Checking a few established schools in UK, the notes varies from 100 to 220 pages, with different focus and depth.
We had identified the followings as the contents for item 1 : Batteries, installation and Operation...
In module 3, we had
covered the construction of batteries.
In this module 12/11, we
cover on how the battery is installed in aircraft.
We expect the students to
know:
◦Safety
practices
◦The
practical installation and maintenance.
◦The
operation as intended for the aircraft.
◦The
circuit diagram
◦ The advantages and disadvantage of different types of batteries. Example, power to weight ratio, voltage stability and cost.
◦ The advantages and disadvantage of different types of batteries. Example, power to weight ratio, voltage stability and cost.